Residential Rooftop Solar
1 kW to 10 kW on-grid systems for bungalows, row houses and apartments - subsidy application included.
Rajkot, Gujarat
Rajkot is one of the better rooftop solar cities in Gujarat, and the reasons are structural rather than promotional. Irradiance across Saurashtra is high, the city is dominated by independent houses and low-rise apartments with flat open terraces, and the residential load profile is heavy enough that a properly sized array actually clears the bill rather than trimming it. Homes along Kalawad Road, University Road, Raiya Road and Mavdi commonly bill 350 to 600 units a month, which sits squarely in the 3.3 kW to 5 kW range, and PM Surya Ghar's residential subsidy of up to ₹78,000 covers a very large share of that installed cost. Because most of these roofs are unshaded and single-owner, the design is also simpler than in a dense metro: one orientation, short DC runs, no lift-room shadow and no society approval to negotiate. The commercial picture is what makes Rajkot distinctive. The Aji and Metoda estates hold one of India's larger engineering, casting and machine-tool clusters, and those units draw heavily through the working day - which is exactly when a rooftop array produces. That means generated units offset a commercial tariff directly rather than being exported for a lower credit. Industrial connections are not subsidy-eligible, since PM Surya Ghar covers residential connections only, but the arithmetic on a foundry or machining shed frequently works on tariff displacement alone. Where those projects need honesty is the roof itself: sheeting on older casting and machining sheds carries heat, vibration and sometimes years of deferred maintenance, so we inspect purlin spacing, sheet condition and skylight layout before we quote, and any roof repair we recommend is priced as a separate visible line rather than buried in the structure cost. Two design factors are specific to Saurashtra. Heat is the first: Rajkot rooftops routinely exceed 50°C surface temperature in May, module output falls as cell temperature climbs, and a plant designed on datasheet conditions alone will quietly underperform its own projection. We use low temperature-coefficient modules, keep clearance under the array for convective cooling and site inverters in shaded, ventilated positions. Dust is the second: the dry season deposits a persistent film that costs generation steadily rather than dramatically, so a defined cleaning cycle belongs in the handover document, with walkway access designed so cleaning never means standing on modules or sheeting. Net metering across the district runs through PGVCL, and files that arrive complete at the correct sub-division office clear far more predictably than those needing resubmission - we prepare and track the whole package. Rajkot is covered on a scheduled project basis from our Ahmedabad base, and we confirm the survey date and service arrangement in writing before you commit.
Get up to ₹78,000 Government Subsidy on Solar Installation
Check Your EligibilityTell us about your property in Rajkot and we'll send system size, price and your ₹78,000 subsidy eligibility.
12+
Years installing solar in Gujarat
3,400+
Rooftops commissioned
25 Yr
Panel performance warranty
MNRE
Empanelled & GEDA registered vendor
Rajkot is covered on a scheduled project basis from our Motera, Ahmedabad base. Survey, structural inspection and shadow analysis are completed in a single fixed-date visit, and the written quotation follows afterwards. Saurashtra summers and dust load mean we specify low temperature-coefficient modules, a generous air gap under the array, shaded inverter placement and a defined cleaning cycle rather than leaving maintenance to chance. For Aji and Metoda sheds we review roof condition and load-bearing capacity before pricing, and we quote any recommended repair separately so a comparison against other quotations stays like-for-like. Send your pincode and the last twelve months of bills and we will confirm coverage and a survey slot before quoting.
We install from Kalawad and University Road homes to the Aji and Metoda industrial estates. Locations served from this page include:

These are our three official quotation-backed rooftop packages. Prices are the same in Rajkot as everywhere else we work - only the roof survey, structure and cable run are site-specific.
6 Nos - 545/550/555W Mono Bifacial, Adani MNRE Approved
Final Cost After Subsidy
₹86,000
Small homes, monthly bill ₹2,000–3,000
Get This Quote7 Nos - 545/550/555W Mono Bifacial, Adani MNRE Approved
Final Cost After Subsidy
₹1,10,800
Medium homes, monthly bill ₹3,000–4,500
Get This Quote8 Nos - 545/550/555W Mono Bifacial, Adani MNRE Approved
Final Cost After Subsidy
₹1,36,500
Larger homes, monthly bill ₹4,500+
Get This QuoteSubsidy amount and eligibility are governed by the Government of India's PM Surya Ghar scheme guidelines and are subject to change. Final amount depends on DISCOM approval.
Extra cabling beyond 30 metres, DISCOM/net-meter charges and non-standard structures are billed as actual and shown in your written quotation before you sign.
Not sure which size fits? Use our solar cost calculator or read the full ₹78,000 subsidy breakdown.
One team for system design, supply, installation, net metering and subsidy paperwork - across Ahmedabad and nearby Gujarat cities. As a full-service solar EPC company in Ahmedabad we also handle commercial solar installation for factories, warehouses and offices, and quote the real solar panel installation cost in Gujarat before you commit.
1 kW to 10 kW on-grid systems for bungalows, row houses and apartments - subsidy application included.
10 kW to 1 MW+ plants for factories, showrooms, schools and hospitals with accelerated depreciation benefits.
Panel cleaning, inverter health checks, generation audits and breakdown support across Ahmedabad and Gujarat.
Net-metered on-grid savings, battery-backed off-grid for farms, or hybrid systems for outage-prone areas.

Tariffs, rooftops, weather and DISCOM process vary across Gujarat. Here is what our engineers plan for specifically in Rajkot.
Rajkot rooftops routinely exceed 50°C ambient in May. Module output falls as cell temperature climbs, so a plant designed on datasheet conditions alone will underperform its projection. We choose modules with a low temperature coefficient, keep at least 150 mm of clearance for convective cooling, and site inverters in shaded, ventilated positions instead of against a west-facing wall.
Casting and machining sheds in Aji and Metoda often carry older sheeting plus internal vibration and heat. We inspect purlin spacing, sheet condition and skylight layout before quoting, and design walkways so cleaning does not require standing on the sheeting itself. Any recommended roof repair is priced separately so the comparison against other quotes stays honest.
Most Rajkot homes are single-owner with flat, unshaded terraces, so a 3 kW to 5 kW array fits in one orientation with short cable runs and no society approval to negotiate. That avoids the yield penalty of splitting a system across two roof faces and keeps the installation itself to a couple of days rather than a drawn-out access exercise.
Net metering across Rajkot district is a PGVCL process, and most of the delay homeowners experience comes from files returned for a missing datasheet or unsigned drawing rather than utility backlog. We lodge the application, single-line diagram, module and inverter datasheets and installer credentials together at the correct sub-division office, then track feasibility approval and the bidirectional meter appointment.
Why solar makes sense here
Rajkot and the wider Gujarat belt receive roughly 5.5–5.9 kWh/m² of solar irradiance daily across nearly 300 clear-sky days. The same panel generates 10–15% more units here than in most Indian states.
With net metering, daytime generation runs your home and surplus units are exported to the grid against your bill. Most households drop from thousands per month to a fixed minimum charge.
Central government subsidy of up to ₹78,000 is credited straight to your bank account after DISCOM inspection, cutting the effective cost of a 3 kW rooftop system by nearly 40%.

Share your electricity bill on a call or WhatsApp. We calculate the right system size, subsidy and savings - no charge, no obligation.
Our engineer visits your rooftop, checks shadow-free area and structure, and gives you a fixed written quotation.
Tier-1 panels and mounting structures installed in 2–3 days, followed by net-meter application and DISCOM inspection.
Subsidy credited to your account, generation monitoring set up, plus scheduled cleaning and 25-year performance cover.
4.8 / 5 from 260+ reviews
"Bill went from ₹3,800 a month to under ₹300. The ₹78,000 subsidy was credited in about seven weeks and they handled every form with Torrent Power themselves."
"Two other vendors kept dodging questions about net metering. This team explained the whole UGVCL process on day one and finished installation in three days."
"Our unit's monthly power cost dropped by ₹1.9 lakh. Payback is tracking under three years including depreciation benefit. Cleaning crew visits every quarter as promised."
"Honest sizing advice - they actually talked me out of a bigger system I didn't need. Generation is exactly what they estimated after eight months."
Send your latest bill and we'll return an exact quote - system size, generation estimate, net cost after the ₹78,000 subsidy, and payback period.
Free site survey, no obligation.
Share a few details and our Ahmedabad team will call you back with an exact system size, price and your ₹78,000 subsidy eligibility.
Costs, subsidy, payback and maintenance questions we answer every day in Rajkot.
Local teams, local DISCOM paperwork. Pick your city for pricing and subsidy details.