12+ years, only solar
Installing rooftop solar in Gujarat since 2013 - we have never been an electrical contractor doing solar on the side.
Installing solar in Gujarat since 2013
Rooftop solar is a 25-year decision fitted in three days. What separates installers is not the panel brochure - it is who surveys your roof, who bolts the structure down, and who answers the phone in year seven.

12+
Years installing solar in Gujarat
3,400+
Rooftops commissioned
25 Yr
Panel performance warranty
MNRE
Empanelled & GEDA registered vendor
Installing rooftop solar in Gujarat since 2013 - we have never been an electrical contractor doing solar on the side.
Residential, society and industrial systems from 1 kW to 300 kW, the large majority inside Ahmedabad district.
The team that surveys your roof installs it. Fixed crews mean consistent workmanship and accountability.
Registered vendor status is what makes your subsidy application eligible in the first place - verify us on the national portal before you pay anyone.
Same-day phone support and 48-hour engineer visits in Ahmedabad, because the service team is 20 minutes away, not in another state.
One price after survey, with inclusions and exclusions listed. No revisions after the structure goes up.
Use this as a checklist on any quote you receive in Ahmedabad - including ours.
| What to check | With us | Typical low-cost vendor |
|---|---|---|
| Survey before quoting | Free engineer visit with shadow analysis | Phone estimate, size guessed from bill |
| Quote format | Fixed written price with inclusions & exclusions | Verbal or one-line price, revised later |
| Installation crew | Our own salaried crews | Subcontracted labour, changes site to site |
| Subsidy filing | Filed and tracked by us at no extra cost | Documents handed to you to figure out |
| Workmanship warranty | 5 years, including roof waterproofing | Rarely written down |
| After-sales | Local Ahmedabad service base, 48-hour visits | Support number that stops answering |
4.8 / 5 from 260+ reviews
"Bill went from ₹3,800 a month to under ₹300. The ₹78,000 subsidy was credited in about seven weeks and they handled every form with Torrent Power themselves."
"Two other vendors kept dodging questions about net metering. This team explained the whole UGVCL process on day one and finished installation in three days."
"Our unit's monthly power cost dropped by ₹1.9 lakh. Payback is tracking under three years including depreciation benefit. Cleaning crew visits every quarter as promised."
"Honest sizing advice - they actually talked me out of a bigger system I didn't need. Generation is exactly what they estimated after eight months."
Share a few details and our Ahmedabad team will call you back with an exact system size, price and your ₹78,000 subsidy eligibility.