Skip to main content
Subsidy scheme deadline: March 2027 - apply nowSee pricing after subsidy →
SolarPanel AhmedabadRooftop solar since 2013

Subsidy6 min read

Documents Required for Solar Subsidy Application in Gujarat

A checklist of every document the portal and your DISCOM will ask for - at application, at installation and at subsidy claim stage.

Solar Panel Ahmedabad - Adani Solar Approved InstallerLast updated:

Nothing delays a subsidy claim like a missing paper or a name that does not match. Collect these before you start the portal application and the whole process gets shorter by weeks.

Stage 1 - Portal application documents

  • Latest electricity bill showing consumer number and DISCOM (Torrent Power, UGVCL, MGVCL or PGVCL).
  • Aadhaar / photo ID of the applicant, matching the connection name.
  • Mobile number linked to the connection for OTP verification.
  • Email address for portal notifications.

Stage 2 - Ownership and premises documents

  • Property ownership proof - sale deed, index copy, or municipal tax receipt.
  • Society or housing NOC for roof use in apartments and shared buildings.
  • Roof photographs and, where available, a rough roof plan for the feasibility check.
  • Load sanction letter if you are enhancing sanctioned load for a larger system.

Stage 3 - Installation and commissioning documents

  • Vendor quotation and work order listing module make, model and DCR status, inverter make and warranty terms.
  • Invoice and payment receipts for the installed system.
  • DCR certificate for the modules and inverter compliance documents.
  • Net metering application and DISCOM commissioning certificate after inspection.

Stage 4 - Subsidy claim documents

  • Cancelled cheque or bank passbook front page in the applicant's name.
  • Bank account details (account number and IFSC) entered on the portal.
  • Plant details submitted on the portal after commissioning.
Quick reference: who provides what
DocumentProvided by
Electricity bill, ID, ownership proof, chequeHomeowner
Quotation, invoice, DCR certificateInstaller
Feasibility approval, net meter, commissioning certificateDISCOM
Portal application and bank submissionHomeowner (we assist)

For the sequence these documents fit into, follow the step-by-step online application guide; to confirm you qualify at all, run the eligibility checklist. Prefer we handle it? Send your bill via /instant-quote and we will list exactly which papers you still need.

Get a free quote for your home

Three fields, 30 seconds. We'll size your system, confirm your PM Surya Ghar subsidy tier and send a fixed written quotation - no site visit charge, no obligation.

Related reading

Frequently asked questions

Call Now WhatsAppFree Quote